Princess Margaret Bridge
Primary structural design consultant for the $77.3M structural upgrading of the 2-lane highway bridge to handle a larger vehicle design load. Developed new outrigging moveable crane for the Contractor to remove and install new bridge deck where normal crane would overstress the bridge.